Design / Construction SCMH Architects, Hunt Construction / NuJak Construction
Budget Estimated cost between $6–8 million
Seating Fixed seating capacity of 3,500 with standing room accommodating up to 5,000.
Total Stadium Area Approximately 192,000 square feet, or 4.4 acres
Playing Surface A-Turf Titan — 84,000 square feet laid over an A-Turf shock pad
Scoreboard 52 feet wide by 30 feet tall
LED Video Board 32 feet wide by 16 feet tall. DVX-1100-1540 with 312 lines of vertical resolution and 600 columns of horizontal resolution.
Lighting Musco Lighting Green Generation Luminaire. Total of 46 luminaires at 1,500 watts each.